Provide High Availability Solution (Hot Standby Redundancy) PLC System & HMIs for Controlling and Monitoring of HVAC equipment like Package Units, Heaters, Extract Fans, Fire Dampers, etc. for the following buildings.
-
- Central Control Building
- Emergency Centre and Medical Facility Building
- Well Engineering Workshop Building
- Operation Workshop Building
- Canteen and Recreation Building
Sentrol Automation has provided ABB – AC-500 High Availability Solution (Hot Standby Redundancy) PLC System & HMIs in the projects.
The HVAC Equipment is locally controlled and monitored through the Graphics Pages provided on the 15” Touch panels which is mounted on the Control Panel Fascia.
The Plant DDCs/ HVAC Control panels were connected to the DCS through volt free contacts which can warn the maintenance engineer of any trouble within the facility.
The Project is engineering is ongoing.
Controls Systems Used:
About Ain Tsila
Ain Tsila Gas field is located in the Illizi Basin in the Eastern part of the Sahara Desert in southeast Algeria
- Project
- Ain Tsila Development (WWTP & Oxygen Building Substations)
- Scope of Work
- HVAC Controls with Redundant PLC System
- Industry
- Oil and Gas
- Location
- Ain Tsila Gas field - Algeria
- Client
- Groupement ISARENE
- Consultant
- Petrofac Engineering, Sharjah
- Year
- 2020
- Status
- On going