DoubleTree Hilton Hotels
- Project
- DoubleTree Hilton Hotels
- Scope of Work
- Building Automation System
- Industry
- Hospitality
Introduction
Provide PLC Controls & MCC Panels for Controlling and Monitoring of HVAC equipment for 2 Buildings.
Sentrol has provided PLC Controls & 15” Touch Panels from ABB for the Controls and monitoring of the HVAC equipment. The MCC Panels are also supplied with ABB Switchgear.
The HVAC Equipment is locally controlled and monitored through the Graphics Pages provided on the 15” Touch panels which are mounted on the Control Panel Fascia.
The Plant PLC was connected to the DCS through software integration on Modbus / IP
The Project has been commissioned in 2016 and handed over to the client.
Other Details
Qatalum is an aluminium smelter plant located in Mesaieed Industrial Area that is a joint venture between QatarEnergy and Norsk Hydro.
Controls Systems Used:
- Location
- Al Barsha, Dubai, UAE
- Client
- DoubleTree Hilton Hotels
- Consultant
- -
- Year
- 2015
- Status
- Completed - 2015