Project
Hyatt Regency, Addis Ababa
Scope of Work
Building Automation System
Industry
Hospitality

Introduction

Provide Building Automation System for the HVAC equipment’s like Chillers, AHUs & Fan Coil Units, etc. and Electrical Energy & Water consumptions monitoring of various locations.
We have provided DDC Controls & BMS Supervisor software from TREND Controls/Honeywell. The project consists of around 2000 data points incorporated in 12 Outstation panels & 15” Touch Panels from Loytec for Chiller Plant Manager.
The Chiller parameters are monitored on BMS through software integration on BACnet/IP.
The MCC Panels supplied with ABB Switchgear.
The HVAC Equipment is controlled and monitored through the 963 BMS Supervisor software along with a dedicated 15” Touchpanel is provided for the monitoring and control of the Chilled Water System.
The Project has been commissioned in 2019 and handed over to the client.


Other Details

Hyatt Regency is located just 15 minutes from Bole international airport, and most centrally located on Meskel Square, Addis Ababa.
The hotel stands within a short walking distance to the United Nations Conference Centre and within a 15 min. Drive to the African Union Headquarters with the largest conference facilities in the country. The presidential palace, government, and business offices are also within short reach of the hotel.

Location
Addis Ababa, Ethiopia
Client
ASB Tanzania Ltd.
Consultant
-
Year
2017
Status
Completed - 2019
OUR OFFICE

Sentrol Automation L.L.C



Warehouse No. 28, Plot No. P.599-419
Jebel Ali, Industrial Area-1
P.O.Box: 233506, Dubai – UAE


+971 4883 0560

www.sentrol.ae

info@sentrol.ae

LOCATION

United Arab Emirates


Google Map Location
Click for Location

GoogleMaps



GET IN TOUCH

Follow our activity